Timeline

Working dates, how sure we are, and associated sources

The same dates appear in the History chapters.

Dates here are working dates unless a linked source record says a copy was read. Approximate and contested dates are labelled in the Date column. The 1993 and 1994 CSIL rows are both kept. The 1995 row keeps later official “province-wide” wording beside 1995 newspaper “new/pilot” wording. Later sources disagree about the start year; the available records do not settle it.

The status column says how much public evidence currently supports the row.

On small screens the timeline table scrolls sideways inside its own region. Tab to that region to scroll it with the keyboard. The rest of the page should not require horizontal scrolling.

Working CSIL history timeline. Dates are working dates unless a cited source has been read.
Date Event Confidence / status Associated sources Notes

exact

Hansard: planned Creekview Co-op move from Pearson Hospital

verified-inspected Hansard, 24 February 1984 (Mowat) Contemporaneous MLA speech. Describes six high-lesion respiratory quadriplegics about to leave Pearson for Creekview Co-op, with support services plugged in. Pre-opening; does not name residents or an opening date. See the Creekview chapter.

approximate

Creekview 202 opening (September 1985 in Haw; no 1985 instrument)

bibliographically-confirmed Haw 1989; SCI BC history; Fayerman 2018; Hansard 1986 Haw 1989 dates Creekview 202 opening to September 1985 and describes CPA plus at least six former Pearson residents (five ventilator-dependent) in a 100-unit CMHC co-op. SCI BC history and Fayerman 2018 say 1985. Nielsen (April 1986) says the endeavour began last year. No inspected 1985 opening instrument.

exact

Hansard: Health Minister reports Creekview residents in place

verified-inspected Hansard, 10 April 1986 (Nielsen) Ministerial estimates speech. Six men took up residence in Creekview Cooperative after convincing government agencies; Paraplegic Association sent a photograph. Complete success is the minister’s characterization, not an inspected evaluation finding.

approximate

Creekview evaluation attested (report itself still wanted)

bibliographically-confirmed Mattinson and Rompf 1987 abstract; Haw 1989; wanted evaluation report 1987 PubMed abstract says a formal evaluation was completed by the B.C. government and CPA and names topics, not findings. Haw 1989 paraphrases cost, health-status, and accreditation findings; those paraphrases are Haw’s. Ryan / Ryan & Wiggins authorship remains early-project-notes only. Copy of the report not held.

approximate

ECPM Skill Development Manual (1990) and Keys on Freedom (unconfirmed)

bibliographically-confirmed Roeher bibliography (ECPM 1990); Keys on Freedom still unconfirmed Roeher independently cites a 1990 five-module ECPM manual (listed in a bibliography; unread). Keys on Freedom title/author/year remain early-project-notes only. The evidence is not clear enough to decide whether a distinct 1994 ECPM training manual exists. Van der Klift 1994 Hell-Bent is a separate work. Relationship of ECPM to CSIL is a later account, not a proven official succession.

contested

CSIL ‘established’ 1993 (later attribution; contested)

conflicting-evidence Gauthier 2014 slides; wanted ministry records Gauthier 2014 says established in 1993. Treat as a conflicting later start-year label, not a verified distinct 1993 stage. Do not silently reconcile with 1994 rows. No 1993 ministry file has been read. See the CSIL design and pilot chapter.

contested

CSIL pilot / ‘established’ 1994 (contested starting year)

conflicting-evidence Ombudsperson 2012; Gauthier 2015; IFRC Our Team; wanted ministry records Ombudsperson 2012 assigns pilot/created/introduced to 1994 (later official). Gauthier 2015 and IFRC also use 1994 as established/start. Candidate pilot-stage year; not reconciled with the 1993 recollection or with missing ministry records. A 1994 ECPM training revision is a separate, still-unresolved identity question (see the ECPM chapter).

approximate

Province-wide CSIL availability (later official chronology)

bibliographically-confirmed Ombudsperson, Best of Care Part 2 (2012); HEU Guardian Nov/Dec 1995 2012 Ombudsperson: province-wide in 1995 (later official stage). Nov/Dec 1995 HEU still calls CSIL a new/pilot Community Support Branch / Continuing Care Division program (~130 clients). Do not treat province-wide 1995 as verified from 1990s files; keep both pictures visible.

exact

CSIL Program Review Synthesis Report (November 2008)

verified-inspected Inspected IA Microlog fiche; Best of Care footnote 207 Cover dated November 2008; prepared-by page dated November, 2008. James Murtagh Consulting named as preparer. Best of Care also refers to a provincial review in 2007; this archive does not treat that 2007 mention as proven identical to this synthesis. The report dates CSIL to the 1990’s and does not choose 1993 versus 1994. See the later-evolution chapter.

exact

Ministry announces CSIL hourly-rate increases (program already provincial)

verified-inspected BC Ministry of Health news release 2011HLTH0018-000298; HCC Policy 4.C Later official evidence of a scaled provincial program (more than 800 clients in the release). Effective date of the first announced increase is 1 April 2011. Does not settle 1993 versus 1994. HCC Policy 4.C later grandfathers clients on CSIL as of 31 March 2011.
No matching items